ARLO Analysis
Trend Analysis:
Performs linear regression on short term (20 day), intermediate term (60 day) and
long term (120 day) high and low analysis to determine if trend lines (rSquare>0.8) and channels exists.
The slope is the daily gain (-loss) of the trend line.Alerts include existence of trend channels and recent break outs.

Trend | Term | Slope | Todays Value | rSquare |
Tops | Long | 0 | 15.08 | 0.37 |
Bottoms | Long | 0 | 8.66 | 0.53 |
Tops | Intermediate | -0.12 | 7.75 | 0.51 |
Bottoms | Intermediate | -0.06 | 8.43 | 0.47 |
Tops | Short | 0 | 9.79 | 0.00 |
Bottoms | Short | 0.06 | 10.36 | 0.93 |
alerts |